Box Hill Road closure

Update 28 May Due to an urgent water leak, Box Hill Road will be closed from 8 PM tonight (Wednesday) until 4 PM Friday (May 30th). For the safety of our teams completing the works, this is a full road closure - all traffic and local residents will need to follow the following diversion – this will be signed. Pebble Hill Road (B2032), Reigate Road (A25), A24, B2209, and Zig Zag Road back to Box Hill Road . Please allow extra travel time. We are sorry for the disruption this will cause, and we are doing everything we can to reopen the road as soon as possible

Our drought plan

Our drought plan

Our Drought Plan has now been published. The document and appendices A,B, E, K and L can all be read below:

Read our Drought Plan 2022

Appendix A - Groundwater Drought Triggers November 22

Appendix B - Bough Beech Drought Triggers November 22

Appendix E - Groundwater Drought Options November 22

Appendix K - SEA non-technical summary November 22

Appendix L - SEA non-technical summary November 22

Our statement of response to our previous consultation in 2021 is still available to read below:

Read our Drought Plan statement of response 2021  

Our existing Drought Plan sets out how we will determine when a drought is triggered, how we will respond operationally, as well as the measures taken to mitigate the effects and monitor the impact of those actions, both during their implementation and afterwards.

Read our Drought Plan 2019