Box Hill Road closure

Update 28 May Due to an urgent water leak, Box Hill Road will be closed from 8 PM tonight (Wednesday) until 4 PM Friday (May 30th). For the safety of our teams completing the works, this is a full road closure - all traffic and local residents will need to follow the following diversion – this will be signed. Pebble Hill Road (B2032), Reigate Road (A25), A24, B2209, and Zig Zag Road back to Box Hill Road . Please allow extra travel time. We are sorry for the disruption this will cause, and we are doing everything we can to reopen the road as soon as possible

Pipework responsibility

Who’s responsible for what pipework?

We don’t actually own all of the pipes our water moves through. The pipework inside your property boundary belongs to you or your landlord. That means if there’s an issue with it, you’ll need to speak with an approved contractor to get it sorted.

Diagram of pipework responsibilities

Shared pipework responsibility

The responsibility for some pipes outside your property could also be shared with a neighbour or neighbours. If they’re shared, then all or some of the property owners will be responsible for fixing any leaks.

Diagram of shared pipework responsibility

Property Responsible for leak 
 A  1
 B  2
 C  3
 B, C & D  4
 E  5
 B, C, D & E  6

You are responsible for the supply pipe, from the point where it enters onto private land, from the street where our main is located. This could mean your supply pipe runs through third party land(s) but you will still be responsible for its repair. If the supply pipe feeds multiple properties a repair may be the joint responsibility of you and your neighbours.